The Definitive Guide to rectifier refurbishment
A NEMA 3R ranking will likely be applied when The existing limiting reactor is located inside the reduced voltage junction box (not accessible on some units) to supply ample air flow/cooling. The latter is completed to avoid wasting feeder wiring.DC power provides tend to be uncovered at the guts of many industries; production, telecommunications,